WORKSPACE · ACME-ELECTRICAL
Overview
Active Agents
14
10 running · 4 dry-run
Runs · 24H
1,510
across all agents
Avg Success
95.3%
last 24 hours
Eval Gates Failed
0
last deploy cycle
Agent Errors
3 failed2 warningsTop Agents · 24H
View all ↗| Agent | Status | Runs | Success |
|---|---|---|---|
IEC 60947-2 Motor Protection Reviewer TPL-01 | Running | 132 | 94.0% |
Siemens Whitelist Enforcer TPL-03 | Running | 78 | 99.1% |
UL 508A Industrial Reviewer TPL-02 | Dry-run | 41 | 92.5% |
Motor Control Drafter TPL-04 | Dry-run | 17 | 88.2% |
IEC 81346 Label Enforcer CST-03 | Running | 12 | 100.0% |
Live Activity
Live- AGT-03annotated 3 violations on PRJ-K12.edzlive
- TPL-06renamed 12 labels to IEC 81346 convention12s ago
- AGT-04datasheet pulled · Schneider LC1D3234s ago
- TPL-01IEC 60947-2 §7.2.2 separation gap OK1 min ago
- AGT-01drafted motor-starter sheet 04/122 min ago
- AGT-02renamed 47 labels (=K1+) → (=K01+)3 min ago